etc engineering solutions

We Plan the Future
By Strengthening the Present

Environmental Impact Assessment

The construction of any structure will always imply some impact on the environment. During the design phase of a new WWTP, ETC Environmental Solutions assesses the impacts of possible interventions in terms of water pollution, air pollution, noise and soil contamination, thus identifying the design and technological solutions (BAT) that have the least possible impact on the environment.

The importance that ETC Environmental Solutions gives to environmental impacts and their mitigation during the design phase makes for a better WWTP throughout its operative life.


  • IDENTIFICATION OF PROJECT REQUIREMENTS IN TERMS OF ENVIRONMENTAL IMPACT
  • ENVIRONMENTAL IMPACT MITIGATION IN THE DESIGN
  • WWTP ENVIRONMENTAL IMPACT ASSESSMENT
  • MONITORING AND REPORTING ENVIRONMENTAL IMPACTS

For more information write to: info@etc-eng.it
Environmental Solutions Projects